COMPANY
PROFILE
Reference List
1995
CLIENT : SAIPEM
/ SEREPT
VESSEL : DLB CASTORO 8 / CRAWLER
LOCATION/PROJECT : TUNISIA
TYPE OF WORK
: Air/Saturation Diving Services. Assistance Jacket ASPF 3 positioning. Spools
pieces and mattresses installations. R.O.V. services
WORK DURATION :
3 MONTHS
1995
CLIENT : SAIPEM
/ AGIP
VESSEL :DLB CASTORO 2 / D.S.V. ECOLDELFINO / ECOLFIUMICINO
LOCATION/PROJECT : Adriatic Sea (ITALY)
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK. Air/Saturation
Diving Services. Spool pieces and Mats Installation. Hydrostatic test - Assistance
Platforms installation - Hot-Tap Installation. Ptf DARIA B-ANGELA ANGELINA-HERA
LACINIA
WORK DURATION :
8 MONTHS
1995
CLIENT : SAIPEM
VESSEL : SEA STORM
LOCATION/PROJECT :Adriatic Sea / PERRO NEGRO 5
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK. Air Diving
Services. Mud and debris removal on Jack-up underwater structures
WORK DURATION : 1 MONTH
1995
CLIENT : SAIPEM / QATARGAS
VESSEL : D.S.V. GMMOS GIANT / DLB CASTORO 5 / D.S.V. PACIFIC TITAN
LOCATION/PROJECT : Ras Laffan - QATAR
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK - Air diving
and ROV services. Sleepers installation for crossing preparation. Pipe laying
assistance. Installation & Removal of permanent/temporary protection on
24" sealine. Free spans correction with grout bags
WORK DURATION : 6 MONTHS
1995
CLIENT : GENOVA / LAW COURT
VESSEL : D.S.V. ECOLFIUMICINO
LOCATION/PROJECT : Ligurian Sea, GENOVA - TANKER "HAVEN"
TYPE OF WORK :Contractor - Air/Saturation diving and ROV service-inspections
inside Tanker wreck
WORK DURATION : 1 MONTH
1995
CLIENT : SAIPEM / CHEVRON
VESSEL : BARGE WB-82
LOCATION/PROJECT :NIGERIA - ESCRAVOS PROJECT
TYPE OF WORK :Independent Sub Contractor - LUMP SUM WORK - Post Trenching
on existing pipelines - Trench widening - Crossing preparation - Permanent protection
installation - Post Trenching on new pipelines
WORK DURATION : 7 MONTHS
1995
CLIENT : SAIPEM / CHEVRON
VESSEL : DLB CASTORO 2
LOCATION/PROJECT : NIGERIA - ESCRAVOS PROJECT
TYPE OF WORK : Air Diving Services. Assistance pipe laying, Plem, Spools pieces
Installation
WORK DURATION : 5 MONTHS
1996
CLIENT : SAIPEM / CABGOC
VESSEL : DLB CASTORO 2
LOCATION/PROJECT : ANGOLA CABINDA
TYPE OF WORK : Air/Saturation Diving Services. Assistance Pipe laying, Jacket
and Spool pieces installation
WORK DURATION : 6 MONTHS
1996
CLIENT : SAIPEM / ENEL
VESSEL : DLB CRAWLER / DSV RAVELLO
LOCATION/PROJECT : Tirrenian Sea, MONTALTO DI CASTRO - Italy
TYPE OF WORK : Air/Saturation diving services. Assistance Pipe laying - Crossing
preparation - Tie-in Post trenching assistance with PTM "GIANO"
WORK DURATION : 2 MONTHS
1996
CLIENT : SAIPEM / AGIP
VESSEL :S/V URAGANO II
LOCATION/PROJECT : ADRIATIC SEA - GARIBALDI Field
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK - Spool pieces
installation, Mats installation - Post trenching with CNS - PTM. As built survey
WORK DURATION : 1 MONTH
1996
CLIENT : CHEVRON / SAIPEM
VESSEL :DLB CASTORO 8 / BARGE WB-82
LOCATION/PROJECT : CABINDA Field - ANGOLA
TYPE OF WORK :Independent
Sub Contractor - Air/Saturation diving services. Assistance pipe
laying. Guide Frame positioning. Jacket and Spool pieces installations. As built
survey
WORK DURATION : 4 MONTHS
1996
CLIENT : TEXACO / SAIPEM
VESSEL : DLB CASTORO 2
LOCATION/PROJECT : COLUMBIA - COVENAS Field Project
TYPE OF WORK :Air diving services. Assistance pipe-laying. Plem-Buoy Positioning
- 24" Spools pieces installation
WORK DURATION : 4 MONTHS
1996
CLIENT : TEXACO / SAIPEM
VESSEL : Barge SILM
LOCATION/PROJECT : COLUMBIA - CHUCHUPA "B" Project
TYPE OF WORK :Independent Sub Contractor - LUMP SUM WORK - Post trenching
operations on 24" with CNS-PTM
WORK DURATION : 3 MONTHS
1996
CLIENT : SAIPEM / AGIP
VESSEL : DSV ECOLFIUMICINO / DLB CRAWLER
LOCATION/PROJECT : Adriatic Sea - REGINA / BRENDA Ptf
TYPE OF WORK : Independent
Sub Contractor - LUMP SUM WORK - Air Diving services - Presurvey,
cleaning, metrology various types of jackets, assistance pipe laying. Clamps,
Riser and Spool pieces installation
WORK DURATION : 18 MONTHS
1996
CLIENT : CHEVRON / SAIPEM
VESSEL : DLB CASTORO 2
LOCATION/PROJECT : NIGERIA - ESCRAVOS Project
TYPE OF WORK : Air Diving services. Clamps, Riser and Spool pieces installation
WORK DURATION : 4 MONTHS
1996
/ 1997
CLIENT : MOBIL / SAIBOS
VESSEL : DLB CASTORO 8 / BOS 355 / BOS 230
LOCATION/PROJECT : NIGERIA - ABACAN NGO Project
TYPE OF WORK : Air Diving services - Assistance pipe laying. Spool pieces installation
WORK DURATION : 4 MONTHS
1996
/ 1997
CLIENT : MOBIL / SAIBOS
VESSEL : BOS 230 / SILM
LOCATION/PROJECT : NIGERIA - USARI - NGL Field Projects
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK - Post trenching
operations with CNS-PTM
WORK DURATION : 3 MONTHS
1997
CLIENT : SAIPEM / AGIP
VESSEL : Barge AD-3
LOCATION/PROJECT : Adriatic Sea / Trenching Project Offshore Ravenna, Pesaro,
Ortona
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK - Post trenching
operations with CNS-PTM
WORK DURATION : 2 MONTHS
1997
CLIENT : VENEZIANA GAS
VESSEL :BARGE AD-3
LOCATION/PROJECT : CHIOGGIA, VENEZIA
TYPE OF WORK : Contractor
- LUMP SUM WORK -
Post trenching operations with CNS-PTM
WORK DURATION : 4MONTHS
1997
CLIENT : SAIPEM / AGIP
VESSEL : S/V SECOMAR 4
LOCATION/PROJECT : Adriatic Sea - REGINA / BRENDA Ptf
TYPE OF WORK : Independent
Sub Contractor - LUMP SUM WORK - Pipelines flooding, pigging and
hydrostatic test
WORK DURATION : 15 DAYS
1997
CLIENT : CHEVRON / SAIPEM
VESSEL : DLB CASTORO 2
LOCATION/PROJECT : NIGERIA - ESCRAVOS Project
TYPE OF WORK : Air diving services. Spools pieces installation
WORK DURATION : 2 MONTHS
1997
CLIENT : SAIPEM / AGIP
VESSEL : HLV PEARL MARINE
LOCATION/PROJECT : Adriatic Sea - BONACCIA Project
TYPE OF WORK : Air diving services. Assistance Jacket installation
WORK DURATION : 2 MONTHS
1997
CLIENT : SAIPEM
VESSEL : DLB CRAWLER
LOCATION/PROJECT : NEW FOUNDLAND, CANADA - HIBERNIA Project
TYPE OF WORK : Air / Saturation diving services. Assistance pipe laying, PLEMs
positioning, Spools pieces installation, Free spans correction, positioning
of stabilisation mattresses. hydrostatic test
WORK DURATION : 4 MONTHS
1997
CLIENT : SAIBOS
VESSEL : DLB CASTORO 8
LOCATION/PROJECT : HUELVA, Spain - POSEIDON Project
TYPE OF WORK : Provision of air diving assistance to the CASTORO OTTO during
pipe laying activities, offshore Spain
WORK DURATION : 1 MONTH
1997
CLIENT : SAIBOS
VESSEL : BOS 355
LOCATION/PROJECT : CABINDA - ANGOLA
TYPE OF WORK : Air/Saturation diving serivices. Repair 12" riser at South
Sanha Platform
WORK DURATION : 1 MONTH
1997
CLIENT : SAIBOS
VESSEL : DSV TAURUS / DLB CASTORO 8
LOCATION/PROJECT : CONGO - KITINA Project
TYPE OF WORK : Air/Saturation
diving services. Pre-pulling winch installation survey-Diving assistance during
pulling cable laying at shore approach - Diving assistance to pipe pulling at
wharf approach - Assistance during normal pipe laying - Free span correction
- Wharf riser, jacket and spool pieces installation - Cleaning of seabed jacket
area
WORK DURATION : 3 MONTHS
1997
CLIENT : SAICLO
VESSEL : FPSO Firenze
LOCATION/PROJECT : Adriatic Sea, OTRANTO - Aquila Field Project
TYPE OF WORK : Installation of SMB system, flexible risers and umbilicals on
FPSO Firenze
WORK DURATION : 2 MONTHS
1997
CLIENT : SAIBOS / MOBIL
VESSEL : DLB CASTORO 8
LOCATION/PROJECT : NIGERIA - MOBIL USARI 2nd CAMPAIGN Project
TYPE OF WORK : Air Diving Services. Diving assistance during jackets and flare
tripods installation, protection mattresses positioning, spool pieces installation.
Video survey
WORK DURATION : 4 MONTHS
1997
CLIENT : SAIPEM / DEVLET SU ISLERI (DSI)
VESSEL : DLB CRAWLER
LOCATION/PROJECT : TURKEY - Manavgat Project
TYPE OF WORK : Independent Sub Contractor - Air and Saturation Diving
Services. Assistance pipe laying, PLEMs positioning, Spool pieces installation.
Assistance Hydrostatic test
WORK DURATION :8 MONTHS