1998
CLIENT : T.M.P.
/ PEMEX
VESSEL : SV UMKA
LOCATION/PROJECT : MEXICO GULF - CAMPECHE SOUND - EPC 27 CANTARELL Project
TYPE OF WORK
: Independent Sub Contractor - Trenching works on existing pipelines
with C.N.S. trenching machine, positioning & R.O.V. spread - Crossing preparation
WORK DURATION :
11 MONTHS
1998
CLIENT : SAIPEM
/ AGIP
VESSEL : DLB CRAWLER - DSV SECOMAR 4
LOCATION/PROJECT : Adriatic Sea - AGIP CAMPAGNA MARE 1998
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK. Air/Saturation
Diving Services - Assistance pipe laying. Tie-in spools pieces installation.
Hydrostatic test activities
WORK DURATION :
3 MONTHS
1998
CLIENT : SAICLO
VESSEL : FPSO FIRENZE
LOCATION/PROJECT :Adriatic Sea, OTRANTO - AQUILA Field Project
TYPE OF WORK : Air Diving Services. Assistance installation of flexible riser
WORK DURATION : 2 MONTHS
1998
CLIENT : SAIPEM / AGIP
VESSEL : AD3 / S/V SECOMAR - S/V BRODOSPAS JUGO
LOCATION/PROJECT : Adriatic Sea - BONACCIA Project
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORK - Air/Saturation
Diving Services. Crossing preparation 14"+3"+3" Barbara T/F sealines
- 24"+3" Barbara T/D - Riser clamps installation at Bonaccia, Barbara
C, Barbara A
WORK DURATION :1 MONTH
1998
CLIENT : SAIPEM / AGIP
VESSEL : BARGE AD3
LOCATION/PROJECT : Adriatic Sea - GARIBALDI FieldsProject
TYPE OF WORK : Independent Sub Contractor - LUMP SUM WORKS - Trenching
works with CNS PTM
WORK DURATION : 1 MONTH
1998
CLIENT : SAIPEM / AGIP
VESSEL : DLB CRAWLER
LOCATION/PROJECT : Adriatic Sea - BONACCIA Project
TYPE OF WORK :Independent Sub Contractor - LUMP SUM WORK - Air/Saturation
Diving Services - Assistance pipe laying, Riser and spool pieces installation,
Hydrostatic test
WORK DURATION : 3 MONTHS
1998
CLIENT : SAIBOS
VESSEL : DLB CASTORO 8 / Barge BOS 230
LOCATION/PROJECT : WEST AFRICA/CONGO/NIGERIA/CAMEROUN - ZATHI, ZAF 4, OSO 2
Y 2 Project
TYPE OF WORK : Air/Saturation Diving Services. Assistance pipe laying - Clamps/risers
and spool pieces installation - Assistance trenching operations with PTM"GIANO"
WORK DURATION : 8 MONTHS
1998
CLIENT : SAICLO / AGIP
VESSEL : DP/SV MAXITA
LOCATION/PROJECT : LIBYA - BOURI Field Project
TYPE OF WORK : Air/Saturation Diving - Risers clamps / Risers installation.
Subsea wells flexible flowlines installation
WORK DURATION : 2 MONTHS
1998
CLIENT : SAIBOS / COTE D'IVOIRE PETROLEUM CO.
VESSEL : DSV CLARA
LOCATION/PROJECT : IVORY COAST - FOXTROT "A" Project
TYPE OF WORK :Independent
Sub Contractor Air/Saturation diving services. - Free span correction
Spool pieces installation
WORK DURATION : 1 MONTH
1998
CLIENT : SAIPEM / RELIANCE PETROLEUM
VESSEL : HLV PEARL MARINE / DLB CASTORO DUE / CASTORO 7
LOCATION/PROJECT : JAMNAGAR, INDIA - JAMNAGAR Project
TYPE OF WORK : Air Diving Service - PLEM positioning - Calm System, Flexible
risers and 48" spools pieces installation
WORK DURATION : 6 MONTHS
1999
CLIENT : T.M.P. / PEMEX
VESSEL : Barge EUROPA
LOCATION/PROJECT : MEXICO GULF - CAMPECHE SOUND - EPC 27 CANTARELL Project
TYPE OF WORK :Independent
Sub Contractor - Trenching operations on existing pipelines with
C.N.S. PTM, positioning & R.O.V. spread - Crossing preparation
WORK DURATION : 7 MONTHS
1999
CLIENT : SAIPEM / AGIP
VESSEL : BARGE AD3
LOCATION/PROJECT : IONIA SEA, CROTONE - Campagna Mare 1998-Hera Lacinia/Luna
A Fields Project
TYPE OF WORK : Independent
Sub Contractor - LUMP SUM WORK - Trenching operations with CNS PTM
on 10"+3" sealines Lenght 4.000 mt, water depth from 50 to 70 mt
WORK DURATION : 1 MONTH
1999
CLIENT : SAIPEM / AGIP
VESSEL : Barge AD3
LOCATION/PROJECT : Adriatic Sea - Bonaccia Project Phase II- LUMP
TYPE OF WORK :Independent Sub Contractor - Air/Saturation Diving
Services. Inspection and repair 3" Sealine flanges
WORK DURATION : 2 MONTHS
1999
CLIENT : SAIPEM / AGIP
VESSEL : S/V MAESTRALE UNO
LOCATION/PROJECT : Adriatic Sea - Barbara and Brenda Fields Project
TYPE OF WORK : Lump sum work Cleaning legs and video survey on Ptf. Barbara
B / Brenda
WORK DURATION : 15 DAYS
1999
CLIENT : SAIPEM / AGIP
VESSEL : DLB CRAWLER
LOCATION/PROJECT : Adriatic Sea - CAMPAGNA MARE 1999 Barbara Fields Project
TYPE OF WORK : Independent
Sub Contractor - Air Diving services. Assistance 12"+3"
pipe laying between Ptf. BARBARA B / BARBARA NW
WORK DURATION : 1 MONTH
1999
CLIENT : SAIPEM / AGIP
VESSEL : S/V IBIS, BARGE AD3
LOCATION/PROJECT : Adriatic Sea - Azalea B / Anemone Cluster
TYPE OF WORK : Lump sum
work - Air Diving services. Riser installation Ptf. Azalea B / Anemone
Cluster - cleaning jacket legs, pigging and hydrostatic test
WORK DURATION : 1 MONTH
1999
CLIENT : SAIPEM / AGIP
VESSEL : S/V ACQUA CHIARA
LOCATION/PROJECT : Adriatia Sea - CAMPAGNA AGIP 1999 - Barbara B / Barbara NW
TYPE OF WORK : Lump sum work - Pigging Hydrostatic test at Ptf. Barbara
B / Barbara NW
WORK DURATION : 10 DAYS
1999
CLIENT : SAIPEM / AGIP
VESSEL : DLB CRAWLER / S/V BRODOSPAS STORM
LOCATION/PROJECT : Adriatic Sea - Ptf BARBARA NW
TYPE OF WORK : Lump sum work - Air Diving. Repair works on jacket Ptf
Babrbara NW
WORK DURATION : 1 MONTH
1999
CLIENT : SAIPEM / AGIP
VESSEL :M/N SEAWORKER
LOCATION/PROJECT : Adriatic Sea - CAMPAGNA MARE AGIP 1999 - BARBARA B / BARBARA
NW
TYPE OF WORK : Lump
sum work - Air/Saturation diving activity. Trenching
operations with CNS PTM on 16" existing pipelines from Ptf. Barbara B to
Ptf Barbara NW
WORK DURATION : 40 DAYS
1999
CLIENT : SAIPEM / INAGIP
VESSEL : S/V ACQUA CHIARA
LOCATION/PROJECT : Adriatic Sea -IVANA Field Project
TYPE OF WORK : Lump
sum work - Pigging and Hydrostatic test from
IVANA A to GARIBALDI K
WORK DURATION : 20 DAYS
1999
CLIENT : SAIPEM
VESSEL : DLB CASTORO DUE
LOCATION/PROJECT : RED SEA, PORT SUDAN - MUGLAD BASIN OIL DEVELOPMENT Project
TYPE OF WORK : Independent Sub Contractor - Air/Saturation Diving Service.
Assistance pipe laying, PLEM positioning, Spool pieces installation
WORK DURATION : 2 MONTHS
1999
CLIENT : SONSUB
VESSEL : DSV SENTINEL
LOCATION/PROJECT : Adriatic Sea - IVANA Field Project
TYPE OF WORK : Air diving services. Assistance trenching operations with PTM
"GIANO" on 16" existing pipeline from IVANA to GARIBALDI
WORK DURATION : 3 MONTHS
1999
CLIENT : SAIPEM / AGMA
VESSEL : DLB CRAWLER
LOCATION/PROJECT : Ligurian Sea - IMPERIA - ITALY
TYPE OF WORK : Air / Saturation diving services. Assistance pipe laying - Free
span correction. 36" / 32" Spools pieces installation
WORK DURATION : 3 MONTHS
1999
CLIENT : SAIPEM
VESSEL : DLB CASTORO DUE
LOCATION/PROJECT : Mediterranean Sea, EGYPT - BALTIM EAST Project
TYPE OF WORK : Air/Saturation Diving Service. Assistance pipe laying - Free
span correction - Clamps riser, Riser and spool pieces installation - Assistance
Hydrostatic test
WORK DURATION : 40 DAYS
1999
CLIENT : SAIPEM / AGMA
VESSEL : BARGE VLADI I
LOCATION/PROJECT : Ligurian Sea, IMPERIA - ITALY
TYPE OF WORK : Air Diving
Service. Free span correction
WORK DURATION : 1 MONTH
1999
CLIENT : SAIPEM / SONSUB
VESSEL : BARGE SOILMARE 1
LOCATION/PROJECT : Ligurian
Sea, IMPERIA - ITALY
TYPE OF WORK :Air Diving Service. Assistance trenching operations on 36"/32"
with PTM"GIANO"
WORK DURATION : 2 MONTHS
1999
CLIENT : SAIPEM / AGMA
VESSEL :
LOCATION/PROJECT : Ligurian Sea, VENTIMIGLIA - ITALY
TYPE OF WORK : Lump sum work - Pigging, Flooding and Hydrostatic test
on 36"+32"
WORK DURATION : 1MONTH
1999
CLIENT : SAIPEM / AGIP
VESSEL : DLB CASTORO DUE
LOCATION/PROJECT : Adriatic Sea - ANNALISA / BRENDA Fields
TYPE OF WORK : Air/Saturation Diving Service. Assistance pipe laying 14"+3"+3"
- Riser clamps, Riser and Spools pieces installation at ANNALISA / BRENDA Ptf
WORK DURATION : 2 MONTHS